Casting equipment - why use automatic level without box molding machine | Guangzhou cast king

Source: Time:2016-08-29 17:51:00 views:

Today, many foundry companies still do not enter the real era of mechanization, many casting enterprises are still using manpower modeling, human casting, etc., with a small number of enterprises are only used semi-automatic molding machine, and not used fully automatic Modeling machine, and our company is doing automatic level molding machine, that in the end what is the difference? What is the level of automatic leveling machine?

Today, many foundry companies still do not enter the real era of mechanization, many casting enterprises are still using manpower modeling, human casting, etc., with a small number of enterprises are only used semi-automatic molding machine, and not used fully automatic Modeling machine, and our company is doing automatic level molding machine, that in the end what is the difference? What is the level of automatic leveling machine?

广州铸王造型机



First of all, the level of automatic molding machine horizontal classification of the casting method can be more easily put sand core and casting after stripping, followed by fully automatic horizontal molding machine can greatly speed up the sand making mode, making work easier, more effectiveness.
However, the use of automatic horizontal molding machine brought about by the effect of how only one or two points then? Its benefits are great, can not be estimated.

广州铸王造型机配置



According to the well-known work efficiency calculation experts say that the production of pipeline operations is a certain law and effect. For example, the production of a casting need to go through four positions 4 processes, then the first job began to produce people, if the production delay for 1 minute then he will affect the next job 2-3 minutes and so on, if the process more, A job slow for a minute will affect the next job slow 2-3 minutes, the whole production will be slow down 10-20 minutes, or even more. If you use the mechanized equipment, as long as the set, there will be no delay in things, and mass production is also very fast, the efficiency is more than 10 times the human.

广州铸王造型机规格尺寸




With the development of society, machinery is to replace manpower, we "cast king" is a professional production of automatic level molding machine, has been in this industry leader, won a total of more than 10 patents, more suitable for some customers, more Good solution to their problems, more practical to meet the needs of most of the foundry, to help them solve their own problems. At present, we mainly do the Secretary for the level of automatic molding machine sandbox specifications are:
700mmx600m, 600mmx550mm, 600x500mm, 520mmx420m various specifications, can also be customized according to customer needs.




keys: 
©2014-2017  Guangzhou City Cast Wang Machinery Equipment Co., Ltd   粤ICP备16070476号-2

Address:No. 10, Beicun North Road, Xinhua Industrial Zone, Huadu District, Guangzhou City PHONE:020-36951799  FAX: 020-36951766 

 mr hu:13926263834     Technical Support:Guangzhou zhu wang

Guangzhou CastKing Sales Manager Telephone


Guangzhou Head Office:
yu he 13926261144
Qibiao Hu 13926263834

Jiangsu Anhui Zhejiang Office:
LiJie 15256578828

Shandong Liaoning Office:
Fangjun Song 13615321588

Hunan Jiangxi Office:
Zehuan Liu 1562225252

Hubei Office, Hubei::
Xingyuan Fu 18759812396

Fujian Office:
Yongqin Hong 18965697621

Guangzhou Casting Wang Sales Manager Telephone